Schedule
The Schedule tab is where you are able to upgrade to advanced schedule capability. EntraPass offers users more flexibility and ease of use by grouping schedules per gateway, connection or system logical components. This option is not automatically enabled upon installation of version 3.18 and higher of EntraPass.
Note: Make sure that you really need to upgrade to advance schedule before checking the box.
Schedules are grouped as follows:
- System schedules: System schedules are applicable to system logical components such as: operators logon schedules, video triggers. System schedules are not loaded in a particular controller; they are applicable to all the system. You can program an unlimited number of system schedules.
- Multi-site schedules: These are defined for each connection. You can define 100 schedules for each Multi-site for such purposes as power supervision (controllers), door unlocking, REX trigger (doors), activation mode (relay), input monitoring.
- After checking the box and clicking OK, a warning appears on the screen indicating that the action is reversible but with consequences.
- We strongly suggest that you perform a backup of your data before activating this option.
- Once the process has been completed, the Schedule tab disappears from the System Parameter dialog.
- Enable schedule to bypass Rex: In order to enable the primary and secondary Rex Bypass message schedule options for doors, The Enable schedule to bypass Rex option must be selected. Please refer to Door Configuration for more details.