Redundant gateway operations
If a redundant server is used in a number of ways, it becomes active following the failure of the primary gateway. You can also manually switch to it and use it during primary gateway maintenance. If a redundant gateway is automatically switched to the primary gateway, the primary gateway can only be reinstated manually.
- From the EntraPass workstation main window, select the Operation tab and click the Gateway button to open the Gateway dialog where all the gateways connected to your system are listed.
- Select your multi-site gateway to see the status of all gateways.
- Right-click on a gateway to view options.
- Select as online gateway to reinstate primary gateway.
A green square highlights the active gateway. A yellow square highlights non-active gateways.
Note: Gateways can be reloaded individually or together. To reload a gateway
individually right-click the gateway and select Reload. To
reload the gateways together right-click the multi-site gateway and select
Reload. This reloads all associated
gateways.
